Describe the issue so another person can find it
Reference the group label, proof revision and view before explaining the problem. For example, identify a passenger-side track interruption rather than writing that the side looks wrong. Attach a current photograph or marked proof showing the area. Keep business wording corrections separate from body-fit questions because they may need different approvers. A good entry describes the observed conflict without pretending to establish the technical remedy.
- Use one issue per entry so it can be closed independently.
- Identify whether the issue affects one unit or the whole group.
Make the decision and owner explicit
Assign the next action to someone who can provide the missing information. The fleet coordinator may need to confirm a body detail; the brand contact may need to approve shorter wording; the shop may need to explain a production boundary. Record the requested response and any effect on release. Avoid treating silence as approval. If the decision changes the scope or price, connect it to the relevant written revision instead of leaving it only in the artwork discussion.
- Separate an accepted exception from an unresolved question.
- State which layout release depends on each outstanding answer.
Verify the correction on the next proof
Close an issue only after checking the revised view against the agreed action. Record the new proof revision and who reviewed it. Do not assume a correction in one view has propagated to every related configuration. At installation handoff, keep a short list of accepted differences that the receiving team should expect. This gives the production and fleet teams a shared reference and makes later replacement-panel discussions easier to trace.
- Check related layouts when a shared message or asset changes.
- Archive superseded marked proofs away from the release folder.
Keep a working record
Before you approve the next step
- Group, unit and proof references provided.
- One issue recorded per entry.
- Current evidence attached.
- Action owner and release effect identified.
- Correction checked on a revised proof.
- Accepted exceptions included in handoff.
Use the free planning tool to organize the details you can confirm and the questions still open.
Four questions before the next step
Can we approve some Transit groups while others wait?
A phased approval can work if the groups, artwork revisions and release boundaries are explicit. Ask the shop to confirm which work is authorized and keep unresolved groups clearly outside that release.
Read the detailed guide: Create a useful Transit proof exception log
What belongs outside the exception log?
Use the log to track decisions, not as a substitute for the full scope, artwork files or vehicle inventory. Link those records so each has a clear purpose and an authoritative version.
Read the detailed guide: Create a useful Transit proof exception log
Should model year alone define a group?
No. Use the actual configuration and relevant equipment details. The year is a useful reference, but it does not replace a body-specific review of the vehicles being supplied.
Read the detailed guide: Group a Transit fleet by the differences that affect graphics
Does grouping mean identical installation time?
No. Existing graphics, condition and the final scope can vary within a body group. Discuss those differences separately when confirming preparation and scheduling arrangements.
Read the detailed guide: Group a Transit fleet by the differences that affect graphics